Bathroom Renovations in Palm Beach County.
More than 200 bathrooms renovated across a decade of Palm Beach County work. Slab-marble showers, freestanding tubs, double vanities, heated floors, and the waterproofing engineered for Florida humidity — built by the same crew, on one fixed price, from demolition through final walkthrough.
From demolition to the punch list, everything in one scope.
Single and double, floating or furniture-style, flat-sawn oak, rift walnut, painted maple. Quartz, marble, or porcelain slab tops.
Linear drains, curbless entries, niche detailing, body sprays, rain heads, thermostatic valves, and steam generators.
Floor, wall, shower. Large-format porcelain, hand-made zellige, book-matched stone slabs, full-height installations.
Cast-stone freestanding, undermount, alcove drop-in. Japanese soaking tubs when ceiling height and floor loading allow.
Kohler, Brizo, Hansgrohe, Toto. Thermostatic valves, handhelds on dedicated valves, wall-mount lavatory faucets.
Pan liners, seam banding, shelf pre-slope, drain integration. Tested for 48 hours before tile goes down.
Panasonic WhisperFit, humidity-sensing, timer controls, properly sized for the room volume and shower venting requirements.
Every Palm Beach County city, every time. We pull, we schedule, we close out the permit.
Three scopes, three budgets. Priced line-item and fixed.
Powder Room / Guest Bath
Floor and wall tile, new vanity, fixtures, lighting, mirror, and ventilation. A full guest bath refresh without relocating plumbing.
- Floor and wall tile
- New vanity and top
- Fixtures and trim
- Mirror and lighting
- Exhaust ventilation
- Permits with local city
Primary Bathroom Remodel
Walk-in shower, custom vanity (single or double), premium tile, freestanding tub option, luxury fixtures — the most-requested primary bath scope in the county.
- Walk-in shower with linear drain
- Custom single or double vanity
- Premium porcelain or natural stone tile
- Freestanding tub (optional)
- Luxury fixture package
- Electrical and plumbing rough-in
- Permits and HOA
Luxury Primary Suite
Full-height porcelain slab showers, steam and rain systems, heated floors, custom millwork, smart mirrors, and layout reconfiguration.
- Full-height porcelain slab showers
- Steam shower and rain head
- Heated floors and towel warmers
- Custom millwork and cabinetry
- Smart mirrors and fixtures
- Layout reconfiguration
Details coastal bathrooms require — and most contractors skip.
Humidity-resistant ventilation engineered for Florida
Standard builder-grade fans push 50 CFM and clog in three years. We size to Panasonic WhisperFit specs at 80–110 CFM with humidity-sensing controls, vented through the roof or soffit per code — never into the attic.
Waterproofing for the coastal climate
Schluter Kerdi or Laticrete Hydro Ban full systems — membrane, banding, pre-slope, and a 48-hour flood test before tile. Florida humidity punishes shortcuts. The county inspector requires the test; we do it whether or not they ask.
Permit requirements for plumbing relocations
Moving a shower drain or relocating a toilet triggers a plumbing permit and a rough-in inspection before tile. We file, schedule, and close out the permit under our Florida CBC license without involving you.
Multi-story condo restrictions
Condos in Palm Beach, Boca, and Highland Beach require Association approval, a licensed contractor, a working-hours window (usually 9–4 weekdays), and protection of common areas. We carry the templates for every major building we've worked in.
The brands and suppliers we specify. Priced transparently; substitutions welcome.
Recent bathroom renovations across Palm Beach County.
The questions we answer on every first consult.
Powder room or guest bath: 3–4 weeks. Primary bath: 5–8 weeks. Luxury primary suite: 8–12 weeks. Timelines include demolition, rough-in, waterproofing, tile, stone, and final fixtures. Custom vanity and stone lead times are the usual long poles.
Most primary-suite remodels pair with a kitchen update.
Combined kitchen and bath scopes run under one project manager, one crew, and one fixed price. Combined projects typically save 10–15% against running the two back-to-back.
Ready to scope your bathroom renovation?
Forty-five minutes on-site. Measurements, waterproofing notes, and a written scope inside seven business days.